Ups functional and transfer tests
Updated 2026-10-13
Data records
- UPS Functional and Transfer Tests is specified for direct-current system chargers in acceptance testing at clause 7.18.2.B.7 of ANSI/NETA ATS-2025. Value: direct-current system chargers.
- UPS Functional and Transfer Tests is specified for direct-current system chargers in maintenance testing at clause 7.18.2.B of ANSI/NETA MTS-2023. Value: direct-current system chargers.
Elsewhere in the family
- UPS Functional and Transfer Tests more on this entry on Electrical Testing Reference
- Phase Rotation and Phasing related entry on Electrical Testing Reference
- Phase rotation and phasing related entry on Motor Testing Reference
- Phase rotation and phasing related entry on Switchgear Testing Reference
- Constant Current Regulator Output related entry on Electrical Testing Reference
- Energization Checks related entry on Electrical Testing Reference
- Engine Generator Load and Performance related entry on Electrical Testing Reference
- Engine Generator Safety Shutdowns related entry on Electrical Testing Reference
- Power Quality and Harmonic Survey related entry on Power Quality Reference
- ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications related entry on Electrical Testing Reference
- ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications related entry on Electrical Testing Reference
Sources
- ANSI/NETA ATS-2025, Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2025 edition, NETA. Cited: clause 7.18.2.B.7. Held as: Purchased single-user copy. Publisher page
- ANSI/NETA MTS-2023, Maintenance Testing Specifications for Electrical Power Equipment and Systems, 2023 edition, NETA. Cited: clause 7.18.2.B. Held as: Purchased single-user copy. Publisher page
Obtaining the documents
- ANSI/NETA ATS-2025: publisher catalog or sales page
- ANSI/NETA MTS-2023: publisher catalog or sales page
Changelog (2 entries)
| Date | Revision | Change |
|---|---|---|
| 2026-10-13 | created (tests.ups-functional-and-transfer-tests.equipment.battery.acceptance) | |
| 2026-10-13 | created (tests.ups-functional-and-transfer-tests.equipment.battery.maintenance) |
Cite this page
Cite the governing standard for the fact itself; cite this page as the finding aid.
"Ups functional and transfer tests." Battery Testing Reference. 2026-10-13. https://www.batterytestingreference.com/tests/ups-functional-and-transfer-tests/.
Battery Testing Reference, Ups functional and transfer tests (Oct. 13, 2026), https://www.batterytestingreference.com/tests/ups-functional-and-transfer-tests/.
@misc{etr-tests-ups-functional-and-transfer-tests,
title = {Ups functional and transfer tests},
howpublished = {\url{https://www.batterytestingreference.com/tests/ups-functional-and-transfer-tests/}},
organization = {Battery Testing Reference},
publisher = {Battery Testing Reference},
year = {2026},
note = {last substantive change 2026-10-13}
}{{cite web |title=Ups functional and transfer tests |website=Battery Testing Reference |publisher=Battery Testing Reference |url=https://www.batterytestingreference.com/tests/ups-functional-and-transfer-tests/ |date=2026-10-13 |access-date=}}